01Can we start with shift spreadsheets?
Select one line. Take the records for two consecutive shifts and the final daily report their supervisor received. Match work orders, machines, shifts, completed quantities and rejects. Keep original downtime notes and ask the supervisor which descriptions refer to the same cause.
If you use an MES, check an export before deciding which fields need a live connection. For machine-level downtime intervals, review the available machine connectivity and OT integration options.
02Which production day owns an overnight shift?
A Monday night shift might finish on Tuesday morning. An MES that groups by completion date and a supervisor who groups by shift start will put the same order on different days. Agree on a production-day rule before aggregating the records. For an order spanning two shifts, assign each shift its reported output and keep the source entries for reconciliation.
03What should a supervisor see at handover?
Suppose a shift produces 500 parts, including 10 rejects under the same inspection rule. The report should show 490 good parts and a 98% yield. If the machine also stopped for 25 minutes and nobody logged the cause, flag it for review with the shift and machine identifiers.
These figures illustrate the format. The actual report can emphasize order progress, output by shift or open exceptions, depending on what the morning meeting needs.
04How can we check the first production line?
Run the automated and manual reports side by side. Include an order spanning two shifts, a late entry or a recorded stop. Trace discrepancies to their source, check that corrections carry through on a rerun, and measure time spent preparing and reviewing each report before deciding whether to extend the pilot.
For a first discussion, identify who enters the figures, who checks them and which three numbers matter at handover. Discuss your daily production report or review the on-site adoption process.